Technology Category
- Functional Applications - Remote Monitoring & Control Systems
Applicable Industries
- Plastics
Applicable Functions
- Discrete Manufacturing
Use Cases
- Process Control & Optimization
The Customer
Gaudlitz
About The Customer
Gaudlitz is a German company specializing in plastics technology and only as recent as 2014 entered the Chinese market.
The Challenge
Gaudlitz was looking to achieve a lean management and production approach so as to improve production efficiency. Workers in the night shift were also taking a very long time to collect data.
The Solution
Werma's SmartMONITOR system was installed in their injection molding equipment to address the aforementioned challenges.
Data Collected
Accuracy, Machine Documentation, Operating Time, Production Efficiency, Throughput per product line
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Plastic Spoons Case study: Injection Moulding
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.
Case Study
Boiler Control System for Plastic Manufacturing Applications
Factory automation applications must be equipped to handle and monitor the myriads of information from attached devices. For plastic manufacturing applications, the boiler control system plays a critical role by gathering and regulating information to ensure production is accurate and smooth. In this particular case, the customer combines eight subsystems that include power meters, water meters, alarm output, displays, and I/O status to be controlled by several intelligent controllers with Modbus RTU interface. The Modbus TCP protocol is used for this application due to the distance. System Requirements: • Modbus serial to Modbus TCP translation • Multiple slaves/masters support • Automatic Modbus TCP response time detection
Case Study
Ascend Performance Materials Case Study
Ascend operations must access multiple software systems to manage day-to-day operations in an effective and secure manner. These systems generate large sets of data which contain critical information pertaining to management systems, planning and cost information in business systems and energy consumption. As a result, Ascend management was challenged with creating relevant reports reflecting performance measures in overall context of their operational process. The company’s previous process entailed collecting and analyzing data manually which was not effective, since the information collected was generated after the fact, and was too complex for collaborative use across the organization.
Case Study
Remake Enterprise-to-production System
The client was running a legacy material flow tracking system and wanted to replace the system with a more effective one as the system was increasingly expensive to maintain and support and also was not extendable. The client's IT landscape was filled with modern applications and it was difficult to interface the material flow tracking system with modern applications.
Case Study
CK Technologies: Leveraging QAD Explore for Continuous Improvement
CK Technologies, a leading thermoplastics solutions provider in the North American commercial heavy truck market, faced a significant challenge in maintaining continuous improvement in their business practices. This was particularly difficult due to the nature of their low volume, high variability business. The company produces a wide variety of parts for multiple customers, supplies parts for current truck models, and also the service parts for past design versions. They are also one of the first companies in the industry to supply parts in body color for each customer, approximately 1,400 colors a year, which have to be perfectly sequenced for shipment. This complexity in their operations made it challenging to stay informed and inspired to accomplish continuous improvement.